Frost patterns on a window pane, in black and white. Illustrative photo: not the plant.

Infrastructure · Moulay Bousselham

Cold rooms, a packing hall and sun on the roof.

An industrial plant in Moulay Bousselham, on 37,688 m² of land: cold rooms, a packing hall and integrated solar energy.

The plant in figures

Four numbers to size up the plant

37,688m²
Total landIn Moulay Bousselham. The landscaping keeps the 1,230 avocado trees that were already on the site.
5,610m²
Built areaCovered floor area of the industrial plant.
10
Separately controlled cold roomsFrom −25 °C to +15 °C, each set to the product it holds.
4
Storage tunnelsIn addition to the cold rooms and the packing hall.

Six construction phases

How our plant was built.

From the technical studies to the start of operations.

  1. Phase 1

    Technical studies and permits

    Completion of architectural and technical studies, structural and MEP engineering, permit application and contractor tendering.

  2. Phase 2

    Earthworks and foundations

    Site setup, general earthworks, underground networks, foundations and base infrastructure.

  3. Phase 3

    Steel structure and roofing

    Erection of the structure, industrial steel framework, roofing, cladding and exterior enclosures.

  4. Phase 4

    Finishes and technical installations

    Interior partitions and finishes, electrical and plumbing networks, machine room, cold rooms and industrial flooring.

  5. Phase 5

    Access roads and landscaping

    Truck access roads, maneuvering areas, parking lots, perimeter fencing and landscaping that keeps the existing 1,230 avocado trees.

  6. Phase 6

    Equipment and commissioning

    Installation of the packing lines, technical tests, equipment calibration, staff training and start of operations.

Economic impact

Investment and jobs in Moulay Bousselham

40–45 million dirhams invested

The industrial plant in Moulay Bousselham represents an investment of MAD 40–45 million in packing and cold storage of fresh produce in the Rabat-Salé-Kenitra region.

50–60 direct jobs

In production, maintenance, administration, quality and safety, in addition to indirect jobs in transport, maintenance and related agricultural services.

Integrated sustainability

Energy, water and waste, managed on site

Solar energy

Photovoltaic panels on the roof and on the parking canopies produce green electricity, partially covering the needs of the cold rooms, the packing equipment and the lighting.

Water management

Two existing boreholes 40 m deep, optimized water circuits, and recovery and reuse for non-food uses.

Waste management

Sorting at source, reuse and composting of organic waste, and licensed contractors for special waste.

Location

Moulay Bousselham, Kenitra Province

Rabat-Salé-Kenitra region, Morocco

See Moulay Bousselham on Google Maps
The Moulay Bousselham lagoon and the Atlantic under a clear sky
The lagoon at Moulay Bousselham: the area, not the plant itself. Photo by Younes Mahrach, Wikimedia Commons (CC BY-SA 4.0).

Guided tour

Want to see our facilities?

We run guided tours so you can see the cold rooms, the packing hall and the equipment firsthand. Book a visit and come to the plant.

What you will see on the visit

  • Main facade
  • Fresh produce intake
  • Packing hall
  • Cold rooms
  • Dispatch area and loading docks
  • Rooftop solar installation

Avofelah

Packing, cold storage and logistics for fresh produce.

Español

Contact

[email protected]

Moulay Bousselham, Kenitra Province, Morocco

© 2026 Avofelah SARLIllustrative photos from Wikimedia Commons: Treysam, Denis Kasozi, Katie Chase, liz west, Lior Mazliah, Younes Mahrach, Ivar Leidus, Nur Afni Setiyaningrum and ::ErWin (CC BY, CC BY-SA, CC0).